Shooting schedule and calendar

Assign scenes to dates, reorder them and review restrictions.

How a shooting day is created

A date becomes a shooting day when it has at least one scene. Unassigned scenes remain to be scheduled. Each screenplay has its own plan. Shooting dates differ from story days and from A/V screen duration.

Assign and move scenes

Open the shooting schedule and choose list or calendar view.

  1. Set the date beside a scene, drag it onto a day, or use + Scene in a calendar day. Menus also work without dragging on touch and keyboard.
  2. Reorder the day’s scenes and complete its title/notes where offered. Change a scene’s date or drag it to move it.
  3. Remove its date assignment to unschedule it. Moving the last scene removes the empty day: check day-specific information first.
  4. Review warnings from dossier calendar rules. Change the date or deliberately accept an offered override.

Before distributing the plan

Check unassigned scenes, shooting order, cast, locations and eighths, then review DOOD and Documents. There is no automatic schedule optimization or comprehensive department availability check. Rules produce warnings and may allow overrides; production staff must verify the final plan.

Rules directly in the schedule

Open “Periodo e giorni non lavorativi” in the shooting schedule to set start/end dates and weekly days off. In the calendar choose Off, Holiday or Travel day for a date. “Regole settimanali” removes that single-date exception but keeps weekly days off and multi-day stops. Warnings allow an explicit override; scenes are never moved or deleted. Rules are shared with the dossier.